| Water Fabrication |
| |
Wet Chemical
Application-Flow Analysis |
| |
Water Belt Transport
Optimization |
| |
Water Handling in Transfer
Areas/Indexing Docks |
|
| Product Testing |
| |
Vibration and Impact
Analysis |
|
|
Case Study -
Microelectronics Impact Testing |
| |
Drop Testing |
|
|
Case Study -
Microelectronics Product Testing |
| |
Packaging Evaluation |
| |
Interaction of Parts |
| |
Quality Assurance |
| - Top of the page - |
| Wire Bonding |
| |
Characterization of Bond |
| |
Trajectory of Wire Path |
| |
Time/Motion Modeling of
Bonding Machine
- Optimize Performance
- Set Guidelines for P.M. |
| |
Diagnosis of Machine Failure |
| |
R&D of Bond/Timing
Relationships |
| |
Increase Machine Performance
and Yield |
| |
Analysis of Ball Formation |
|
| Component Insertion
& Surface Mount |
| |
Diagnosis of Machine Failure |
| |
Time/Motion Modeling of
Performance |
| |
Design
Improvements-Modification of Parts |
| |
Training Tool for Operator |
| - Top of the page - |
| Machine Design |
|
|
Video
- Machine design & diagnosis |
| |
Accelerated Machine Design |
| |
Improved Performance |
| |
Failure Diagnosis |
| |
Timing of Solenoids and
Other Movements |
| |
Contact Probe Analysis |
| |
Component Marking and
Identification |
|
| Vendor Equipment
Evaluation |
| |
Evaluate New
Machines/Prototypes |
| |
Diagnose/Identify Problem
Areas to Vendor |